The analysis documented herein is specifically applicable to the Firemain, Flushing, and Washdown System--ship's work authorization boundary (SWAB) groups 521-1, 521.2, and 523-1--installed on LHA-2 Class ships. The analysis considers only the systems and equipments installed and the documentation effective as of 22 April 1981. The system was selected for analysis by PERA (ASC) on the basis of its mission critically and historical maintenance burden. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    System Engineering Analysis of Firemain, Flushing, and Washdown System Installed on LHA-1 and LPH-2 Class Ships


    Beteiligte:
    W. E. Stevens (Autor:in)

    Erscheinungsdatum :

    1982


    Format / Umfang :

    55 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch