The analysis documented herein is specifically applicable to the topside boat, airplane, repair, missile, & traveling & bridge cranes installed on AD-14, AD-37, AR-5, AS-11, AS-19, AS-31, AS-33, AS-36, & AS-39 class ships. The analysis considers only the systems and equipments installed and the documentation effective as of 30 September 1981. The subject crane systems were selected for analysis by PERA (CSS) on the basis of their mission criticality & historical maintenance burden. (Author)
System Engineering Analysis of Topside Cranes Installed on AD, AR, and AS Class Ships
1982
64 pages
Report
Keine Angabe
Englisch
Marine Engineering , Logistics Military Facilities & Supplies , Cranes , Maintenance management , Tenders(Vessels) , Ship decks , Tiedown devices , Bolts , Hydraulic equipment , Electrical equipment , Hooks , Corrosion , Systems engineering , Naval vessels , Auxiliary , Spare parts , Preventive maintenance , Scheduling , Systems analysis , Repair ships , Submarine tenders , Destroyer tenders , Overhauling
Engineering Index Backfile | 1957
|Optimization of topside electromagnetic environment (ships)
Tema Archiv | 1990
|Bigger cranes for bigger ships
Online Contents | 1997
|