The analysis documented herein is specifically applicable to the Liquid Cargo Handling System (LCHS), ship's work authorization boundaries (SWAB) groups 544-1 and 544-2 installed on A0-177, A0E-1, and A0R-1 Class ships. It considers only the systems and equipments installed and documentation effective as of 30 Sept. 1981. This system was selected for analysis by PERA (CSS) on the basis of its mission criticality and historical maintenance burden.
System Engineering Analysis of Liquid Cargo Handling System Installed on AO-177, AOE-1, and AOR-1 Class Ships
1982
74 pages
Report
Keine Angabe
Englisch
Antiaircraft Defense Systems , Industrial & Mechanical Engineering , Logistics Military Facilities & Supplies , Pumps , Tankers ships , Valves , Piping systems , Cargo handling , Liquids , Pumping , Maintenance management , Combat support , Replenishment at sea , Fuel oil , Jet engine fuels , Lubricating oils , Naval logistics , Systems analysis , AO-177 class vessels , AOE-1 class vessels , AOR-1 class vessels , LCHS(Liquid Cargo Handling System) , CHARO handling system , Cargo pumps , Stripping pumps , JP-5 fuel
Engineering Index Backfile | 1941
|Engineering Index Backfile | 1941
|Engineering Index Backfile | 1941
|Engineering Index Backfile | 1941
|Engineering Index Backfile | 1941
|