The analysis documented herein is specifically applicable to the Firemain, Flushing, and Washdown System--ship's work authorization boundary (SWAB) groups 521-1, 521.2, and 523-1--installed on LHA-2 Class ships. The analysis considers only the systems and equipments installed and the documentation effective as of 22 April 1981. The system was selected for analysis by PERA (ASC) on the basis of its mission critically and historical maintenance burden. (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    System Engineering Analysis of Firemain, Flushing, and Washdown System Installed on LHA-1 and LPH-2 Class Ships


    Contributors:

    Publication date :

    1982


    Size :

    55 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English