When charging in water-filled-hole with emulsion mixed loading truck, if the charging hose can not reach the borehole bottom, there will be a water column in the charge. Emulsion explosive charging in water-filled-hole is simulated under three conditions with different water levels, charging velocity and hole diameter when the hose of the explosive mixed loading truck does not reach the hole bottom. The results show that explosive can not reach the bottom of the blasthole if the water depth exceeds the maximum effective range of the jet flow, which is proportional to charging speed and hole diameter, and there will exist a water column at the bottom of the hole. To prevent that, the distance between the hose outlet and the hole bottom must be shorter than the effective range when charging. Besides, increasing charging velocity also works.


    Access

    Access via TIB

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Numerical Simulation of Mixed Emulsion Explosive Charging in Water-Filled-Hole


    Contributors:
    Ye, Hai-Wang (author) / Nong, Dong Ling (author) / Li, Ting (author) / Ye, Jie-Wang (author)


    Publication date :

    2013


    Size :

    4 Seiten




    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English




    Emulsion explosive charging device and charging method

    LI JIE / ZHANG YIPING / ZHAO MINGSHENG et al. | European Patent Office | 2023

    Free access

    Emulsion explosive loading and carrying device

    ZHOU TAOSHAN / YE DEHONG / JIANG ZUYONG et al. | European Patent Office | 2023

    Free access

    IN-SITE EXPLOSIVE LOADING TRUCK FOR INTRINSIC SAFETY-TYPE EMULSION EXPLOSIVE

    TANG QIUMING | European Patent Office | 2017

    Free access


    Numerical simulation and experimental study of explosive projectile devices

    Selivanov, V.V. / Gryaznov, E.F. / Goldenko, N.A. et al. | Elsevier | 2017