In order to analyze the different construction program under the tunnel surrounding rock stress, strain and plastic zone changes, we take water tunnel group of nuclear power plant as basic project and the application of software FLACIS3D numerical simulation. The results show that: During the tunnel excavation and support group process, the different rock tunnel construction program can produce different stress, displacement and plastic zone extended range of distribution and other aspects. To interval-type excavation program, although previously disturbing effect of the excavation of the tunnel construction and tunnel excavation of rock, it can generate less impact on the stability of surrounding rock. For the latter excavation of the tunnel, the tunnel project area affected by the first digging, the stress can be released, the stability of the first excavation of the tunnel effect is also small. Comparing to sequential and parallel program-type excavation program, the use of interval-style group of rock tunnel excavation will help stabilize the body.
Study on the Impact of Stability around Tunnel Surrounding Rock in Construction Program
CEABM, International Conference on Civil Engineering, Architecture and Building Materials, 2 ; 1520-1523
Applied Mechanics and Materials ; 170-173
2012
4 Seiten
Conference paper
English
Pipe-Shed Advanced Support Technique of Tunnel Construction with Complicated Soft Surrounding Rock
British Library Conference Proceedings | 2010
|Calculation of Surrounding Rock Pressure on Multi-Arch Tunnel
British Library Conference Proceedings | 2009
|Symplectic Elasticity Analysis of Stress in Surrounding Rock of Elliptical Tunnel
Springer Verlag | 2020
|