Underground gas storage in Slovakia has a 25 years history. The first phase of building, the object for underground reservoir Lab began in 1977. The underground reservoir is separated into five independent parts, phases of building. All parts are concentrated in central control area. The oldest part of equipment for underground reservoir needs overhaul and maintenance today. The maintenance process uncovers a lot of problems that were created through building process. The great problems are uncovered in the area of pipeline system diagnostics. In the past, maintenance operators faced difficult decisions, to choose the best method or combination of methods to evaluate pipeline condition.


    Access

    Access via TIB

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Diagnostics of pipelines system


    Contributors:
    Stroffek, E. (author) / Peterka, P. (author) / Kresak, J. (author) / Kropuch, S. (author)

    Published in:

    Metalurgija, Zagreb ; 45 , 2 ; 137-139


    Publication date :

    2006


    Size :

    3 Seiten, 7 Quellen



    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Magnetometric diagnostics of gas and oil pipelines

    Dubov, Anatoly / Dubov, Aleksandr | Tema Archive | 2010


    The non-contact magnetic diagnostics of pipelines

    Kamaeva, S.S. / Goroshevskiy, V.P. / Kolesnikov, I.S. | Tema Archive | 2004



    Diagnostics of corrosive state of main gas pipelines with module probe technology

    Popov, A.V. / Zhelobetskii, V.A. / Bausov, S.V. et al. | Tema Archive | 2009


    Electrometric diagnostics of corrosion protection for linear sections of gas main pipelines

    Popov, V.A. / Korzunin, G.S. / Zhelobetskii, V.A. et al. | Tema Archive | 2011