Computer technology for a 1975 launch vehicle will have advanced to a point where major performance goals given in the past, in terms of restricted weight, power, and reliability allocations, can be met. for advance planning purposes it is most important to identify the total cost of a computer for this application at a very early time in the development period. Major system configuration can then be determined on the basis of this cost.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    A minimum cost computer for a 1975 launch vehicle


    Contributors:

    Published in:

    Computer Design ; 8 , 12 ; 41-46


    Publication date :

    1969


    Size :

    6 Seiten, 8 Bilder, 1 Tabelle, 4 Quellen


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Launch Vehicle Design Features For Minimum Cost

    Portz, R. / American Institute of Aeronautics and Astronautics / ASME et al. | British Library Conference Proceedings | 2004




    Launch operations of minimum cost design launch vehicles

    BRAUN, M. / COHN, B. / GROO, R. | AIAA | 1970