Computer technology for a 1975 launch vehicle will have advanced to a point where major performance goals given in the past, in terms of restricted weight, power, and reliability allocations, can be met. for advance planning purposes it is most important to identify the total cost of a computer for this application at a very early time in the development period. Major system configuration can then be determined on the basis of this cost.
A minimum cost computer for a 1975 launch vehicle
Computer Design ; 8 , 12 ; 41-46
1969
6 Seiten, 8 Bilder, 1 Tabelle, 4 Quellen
Aufsatz (Zeitschrift)
Englisch
Launch Vehicle Design Features for Minimum Cost
AIAA | 2004
|Launch operations of minimum cost design launch vehicles
AIAA | 1970
|AIAA-2006-7259 Hybrid Launch Vehicle Staging Optimization for Minimum Cost
British Library Conference Proceedings | 2006
|