In its gas transport system N.V. Nederlandse Gasunie found a shift from peak load to base load at stations which were not originally designed for that duty. A study was made of the application of recuperators on GE frame 5 gas turbines, based on experience with a prototype installation four years ago. The paper describes the Breda-regenerator in general and the experience of one of the two prototypes which was installed on a Gasunie frame 5 two shaft 24 mW gas turbine compressor unit in 1978. In June 1981 Gasunie decided to equip two more identical gas turbine compressor units at their 100000 HP compressor station at Zweekhorst with Breda-regenerators. The paper covers all aspects of retrofitting the simple cycle gas turbine installations with regenerators at the Zweekhorst station.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Retrofitting a 100000 HP simple cycle gas turbine compressor station with regenerators


    Additional title:

    Rueckanpassung einer 100000 PS Grundgasturbinenkompressorstation mit Regeneratoren


    Contributors:
    Klyn, A. (author) / Wylens, H. (author)

    Published in:

    Publication date :

    1983


    Size :

    8 Seiten, 26 Bilder, 5 Quellen


    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English




    Gas-Turbine Regenerators

    Beck, Douglas Stephen / Wilson, David Gordon | TIBKAT | 1995


    Simple harmonic analysis of regenerators

    Swift, G. W. / Ward, W. C. | AIAA | 1996



    Auktion: 100000

    Horst A. Rittershofer, Kunstversteigerer (Berlin | DataCite | 1949

    Free access

    Der Neuenheimer: 100000

    Neuenheim College | DataCite | 1895

    Free access