In its gas transport system N.V. Nederlandse Gasunie found a shift from peak load to base load at stations which were not originally designed for that duty. A study was made of the application of recuperators on GE frame 5 gas turbines, based on experience with a prototype installation four years ago. The paper describes the Breda-regenerator in general and the experience of one of the two prototypes which was installed on a Gasunie frame 5 two shaft 24 mW gas turbine compressor unit in 1978. In June 1981 Gasunie decided to equip two more identical gas turbine compressor units at their 100000 HP compressor station at Zweekhorst with Breda-regenerators. The paper covers all aspects of retrofitting the simple cycle gas turbine installations with regenerators at the Zweekhorst station.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Retrofitting a 100000 HP simple cycle gas turbine compressor station with regenerators


    Weitere Titelangaben:

    Rueckanpassung einer 100000 PS Grundgasturbinenkompressorstation mit Regeneratoren


    Beteiligte:
    Klyn, A. (Autor:in) / Wylens, H. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1983


    Format / Umfang :

    8 Seiten, 26 Bilder, 5 Quellen


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Gas-Turbine Regenerators

    Beck, Douglas Stephen / Wilson, David Gordon | TIBKAT | 1995


    Simple harmonic analysis of regenerators

    Swift, G. W. / Ward, W. C. | AIAA | 1996



    Der Neuenheimer: 100000

    Neuenheim College | DataCite | 1895

    Freier Zugriff

    Imago: 100000

    DataCite | 1924