The tamping process is crucial for correcting geometric irregularities on railway tracks, especially on newly constructed or renovated tracks that are more susceptible to accumulating defects. Recent studies have demonstrated that multiple insertions of tamping tines lead to greater ballast compaction and improved lateral resistance of the track. However, further evaluation is necessary to assess their impact on other important track parameters. This study evaluated single and multiple insertions to determine which would promote more effective maintenance for newly built or renovated track conditions, focusing on geometry correction, track structural behaviour, and potential ballast degradation. These tamping methods were tested in a heavy haul line, showing that multiple insertions improved geometric quality, increased lateral resistance, and enhanced vertical track stiffness without causing significant ballast degradation. Therefore, using multiple insertions is recommended for newly built or renovated tracks to enhance geometric quality and structural behaviour, providing a more effective maintenance solution.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Field assessment of different tamping operations for newly constructed or renovated railway tracks


    Additional title:

    P. PEREIRA ET AL.
    INTERNATIONAL JOURNAL OF RAIL TRANSPORTATION


    Contributors:

    Published in:

    Publication date :

    2025-03-04


    Size :

    23 pages




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    English




    A Human Reliability Assessment of Railway Tamping Operations

    Porter, D. R. / Institute of Quality Assurance| Safety and Reliability Society | British Library Conference Proceedings | 1995



    Integer Programming to Optimize Tamping in Railway Tracks as Preventive Maintenance

    Vale, C. / Ribeiro, I.M. / Calcada, R. | British Library Online Contents | 2012


    An opportunistic preventive maintenance policy for tamping scheduling of railway tracks

    Bakhtiary, Arash / Zakeri, Jabbar Ali / Mohammadzadeh, Saeed | Taylor & Francis Verlag | 2021


    Tests on lateral resistance in railway tracks during the operation of a tamping machine

    Koc, W / Wilk, A / Chrostowski, P et al. | SAGE Publications | 2011