This paper proposes an opportunistic preventive maintenance policy to schedule tamping interventions aiming to minimize the total maintenance cost. In this policy, the goal is to obtain an opportunistic maintenance threshold (OMT) to decide when to perform preventive tamping operations on given railway segments to minimize total maintenance cost associated with tamping operations. A steady-state genetic algorithm was used to simultaneously find an OMT threshold and tamping scheduling. The proposed approach is tested on data collected from a ballasted railway track. The results show that by taking into consideration an OMT threshold, machine preparation cost can be reduced by about 46%. Moreover, by performing a sensitivity analysis of the tamping effectiveness, it is observed that the negative impact of inefficient tamping is greater than the positive impact of efficient tamping on the total maintenance cost and track quality in this case study.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    An opportunistic preventive maintenance policy for tamping scheduling of railway tracks


    Contributors:


    Publication date :

    2021-01-02


    Size :

    22 pages




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    Unknown





    Integer Programming to Optimize Tamping in Railway Tracks as Preventive Maintenance

    Vale, C. / Ribeiro, I.M. / Calcada, R. | British Library Online Contents | 2012


    Optimisation of railway tamping scheduling

    Khosravi, Mahdi / Ahmadi, Alireza / Kasraei, Ahmad et al. | Elsevier | 2024

    Free access


    Field assessment of different tamping operations for newly constructed or renovated railway tracks

    Pereira, Paulo / Motta, Rosângela / Neto, Alfredo Gay et al. | Taylor & Francis Verlag | 2025