Aircraft manufacturing companies have long production cycles and complex product structures. The assembly process involves a variety of parts and components. There are many types of materials and high requirements for complete sets. The delayed delivery of a certain material will produce a domino effect, which will cause the delivery time of the final parts to be delayed by multiples. In order to reduce the influence of operation delay on the scheduling scheme, this paper studies the robust scheduling operation time difference relaxation. Considering the effect of delay, the robust indexes are selected, and a robust scheduling model with uncertain delays in a single operation is constructed. Then, a robust scheduling method based on operation interval relaxation is proposed, the priority order of operation time difference relaxation is analyzed, and the position and size of the operation time difference relaxation is obtained. Finally, some experiments demonstrated the effectiveness of the operation time difference relaxation method.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Research on Robust Scheduling Method Based on Operation Interval Relaxation


    Additional title:

    Lect. Notes Electrical Eng.


    Contributors:
    Deng, Feng (author) / Chen, Shuo (author) / Gao, Hengyi (author) / Qi, Lin (author) / Wang, Bingsheng (author)


    Publication date :

    2021-11-02


    Size :

    15 pages





    Type of media :

    Article/Chapter (Book)


    Type of material :

    Electronic Resource


    Language :

    English




    Research on Robust Scheduling Method Based on Operation Interval Relaxation

    Deng, Feng / Chen, Shuo / Gao, Hengyi et al. | TIBKAT | 2022


    Robust fixed interval satellite range scheduling

    Vazquez, Antonio J. / Scott Erwin, R. | IEEE | 2015


    OPERATION INTERVAL CONTROL DEVICE AND OPERATION INTERVAL CONTROL METHOD

    NAKANISHI AKIRA / KATSURAGI TAKAYA | European Patent Office | 2019

    Free access

    TRAIN OPERATION INTERVAL CONTROL SYSTEM, AND TRAIN OPERATION INTERVAL CONTROL DEVICE

    TOKUMARU MAKOTO | European Patent Office | 2016

    Free access

    Scheduling by Lagrangian Relaxation

    Yoneda, K. | British Library Online Contents | 1997