In the fall of 1977 the governments of both the United States and Canada will make decisions concerning the transport of Arctic gas to southern markets. The Arctic Gas Proposal, which is the only one permitting Alaskan and Canadian gas to move through one system, is compared to others submitted for their consideration. The need for building the Arctic pipeline is discussed and the plans for its construction are outlined. The development of the Banister 812, an Arctic ditcher designed specifically to meet the requirements of this project, is also described.
The Arctic Gas Pipeline and Its Specialized Equipment Requirements
Sae Technical Papers
28th Annual Earthmoving Industry Conference ; 1977
1977-02-01
Conference paper
English
A System of Specialized Ice Forecasts for Shipping in the Arctic
British Library Conference Proceedings | 1995
|Specialized Handling Equipment. Volume I
NTIS | 1969
|Custom weld metal for arctic pipeline
Tema Archive | 2000
|Requirements on pipeline steel
Tema Archive | 2010
|New Models of Specialized Motor Equipment
NTIS | 1969
|