In the fall of 1977 the governments of both the United States and Canada will make decisions concerning the transport of Arctic gas to southern markets. The Arctic Gas Proposal, which is the only one permitting Alaskan and Canadian gas to move through one system, is compared to others submitted for their consideration. The need for building the Arctic pipeline is discussed and the plans for its construction are outlined. The development of the Banister 812, an Arctic ditcher designed specifically to meet the requirements of this project, is also described.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    The Arctic Gas Pipeline and Its Specialized Equipment Requirements


    Weitere Titelangaben:

    Sae Technical Papers


    Beteiligte:

    Kongress:

    28th Annual Earthmoving Industry Conference ; 1977



    Erscheinungsdatum :

    01.02.1977




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    PIPELINE SYSTEM SPECIALIZED FOR DRONE

    LEE SU GI / KIM CHAN YONG / CHOI MIN GYU et al. | Europäisches Patentamt | 2025

    Freier Zugriff

    Northstar Offshore Arctic Pipeline Project

    Lanan, G. A. / Ennis, J. O. / Canadian Hydraulics Centre | British Library Conference Proceedings | 2001


    A System of Specialized Ice Forecasts for Shipping in the Arctic

    Brovin, A. I. / Yulin, A. V. | British Library Conference Proceedings | 1995


    Specialized Handling Equipment. Volume I

    D. E. Leonard | NTIS | 1969


    Custom weld metal for arctic pipeline

    Harris, R.A. | Tema Archiv | 2000