This paper describes some of the steps necessary to certificate a camera installation in a Part 23 aircraft. The camera is large and necessitates the severing of a major structural member (keel beam). Damage tolerance analysis is required because of the penetration of the pressure vessel. Cable rerouting is necessary because of the location of the hole. The design, the basis for the structural substantiation and the structural substantiation of this design are discussed in this paper.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    A Camera Installation in a Pressurized Part 23 Aircraft


    Additional title:

    Sae Technical Papers


    Contributors:

    Conference:

    General Aviation Technology Conference & Exhibition ; 2004



    Publication date :

    2004-04-20




    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English




    AIRCRAFT INSTALLATION FOR SUPPLYING PRESSURIZED AIR

    PRIETO PADILLA JUAN TOMAS / MARTINO GONZÁLEZ ESTEBAN / BARRON VEGA DIEGO et al. | European Patent Office | 2023

    Free access

    Aircraft installation for supplying pressurized air

    GARCIA ZUAZO ANGEL / ESCUDERO FRAILE SERAFIN / MARTINO-GONZALEZ ESTEBAN et al. | European Patent Office | 2023

    Free access

    AIRCRAFT INSTALLATION FOR SUPPLYING PRESSURIZED AIR

    GARCIA ZUAZO ANGEL / ESCUDERO FRAILE SERAFIN / MARTINO-GONZALEZ ESTEBAN et al. | European Patent Office | 2021

    Free access

    SOFTWARE AIRCRAFT PART INSTALLATION SYSTEM

    MITCHELL JAMES EDWARD | European Patent Office | 2021

    Free access

    Aircraft fuselage part, aircraft and installation method

    FEUILLERAC LAURENT / SALGUES PATRICK / AURIAC VINCENT | European Patent Office | 2021

    Free access