This paper describes some of the steps necessary to certificate a camera installation in a Part 23 aircraft. The camera is large and necessitates the severing of a major structural member (keel beam). Damage tolerance analysis is required because of the penetration of the pressure vessel. Cable rerouting is necessary because of the location of the hole. The design, the basis for the structural substantiation and the structural substantiation of this design are discussed in this paper.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    A Camera Installation in a Pressurized Part 23 Aircraft


    Weitere Titelangaben:

    Sae Technical Papers


    Beteiligte:

    Kongress:

    General Aviation Technology Conference & Exhibition ; 2004



    Erscheinungsdatum :

    20.04.2004




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    A camera installation in a pressurized Part 23 aircraft

    Kaplan, M. P. / Wolff, T. A. / Society of Automotive Engineers | British Library Conference Proceedings | 2004


    Aircraft installation for supplying pressurized air

    GARCIA ZUAZO ANGEL / ESCUDERO FRAILE SERAFIN / MARTINO-GONZALEZ ESTEBAN et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    AIRCRAFT INSTALLATION FOR SUPPLYING PRESSURIZED AIR

    PRIETO PADILLA JUAN TOMAS / MARTINO GONZÁLEZ ESTEBAN / BARRON VEGA DIEGO et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    AIRCRAFT INSTALLATION FOR SUPPLYING PRESSURIZED AIR

    GARCIA ZUAZO ANGEL / ESCUDERO FRAILE SERAFIN / MARTINO-GONZALEZ ESTEBAN et al. | Europäisches Patentamt | 2021

    Freier Zugriff

    SOFTWARE AIRCRAFT PART INSTALLATION SYSTEM

    JAMES EDWARD MITCHELL | Europäisches Patentamt | 2016

    Freier Zugriff