This paper discusses the cyclic loads imposed on gas turbine engines when used for traction and APU operation in various turbine powered trains. The paper also discusses train and operating procedures that should be followed to reduce engine cycling to a minimum to extend engine operating life.
Duty Cycles for Turbine-Powered Trains
Sae Technical Papers
1977 International Automotive Engineering Congress and Exposition ; 1977
1977-02-01
Conference paper
English
Duty cycles for turbine-powered trains
Tema Archive | 1977
|Application Report - Turbine-Powered, High-Speed Trains Under Further Development
Online Contents | 1994
Amtrak buys six Turbomeca powered trains
Tema Archive | 1974
Heating of diesel-powered passenger trains
Engineering Index Backfile | 1950
Hybridization of Fuel Cell Powered Drive Trains
British Library Conference Proceedings | 2002
|