This work presents a simple and useful project process model. The project model directly shows how a few basic parameters determine project duration and cost and how changes in these parameters can improve them. Project cost and duration can be traded-off by adjusting the work rate and staffing level. A project's duration and cost can be computed on the back of an envelope, with an engineering calculator, or in a computer spreadsheet. The project model can be simulated dynamically for further insight. The project model shows how and why projects can greatly exceed their expected duration and cost. Delays and rework requirements may create work feedback loops that increase cost and schedule in non-proportional and non-intuitive ways.
A Simple Project Process Model for Estimating and Controlling Cost and Schedule
Sae Technical Papers
International Conference On Environmental Systems ; 2006
2006-07-17
Conference paper
English
TCASE: Technology Cost and Schedule Estimating Tool
AIAA | 2013
|Project Cost and Schedule Risk Assessment
British Library Conference Proceedings | 2008
|Space project management - cost & schedule management
SLUB | 1996
|TCASE: Technology Cost and Schedule Estimating Tool (AIAA 2013-5523)
British Library Conference Proceedings | 2013
|