This document contains the system requirements for the IADS data elements and functional capabilities developed during ATD-2 Phase 3.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    ATD-2 Integrated Arrival/Departure/Surface (IADS) Phase 3 System Requirements


    Contributors:

    Publication date :

    2020-07-01


    Type of media :

    Miscellaneous


    Type of material :

    No indication


    Language :

    English




    Distributed Schemes for Integrated Arrival Departure Surface (IADS) Scheduling

    Idris, Husni / Shen, Ni / Bertino, Jason et al. | NTRS | 2016


    ATD-2 Integrated Arrival, Departure, and Surface (IADS) Operations

    Foyle, David C. / Hooey, Becky L. / Bakowski, Deborah L. | NTRS | 2018


    ATD-2 Integrated Arrival/Departure/Surface (IADS) System Specification - Phase 2

    Ngo, Tyler T. / Wilson, Stuart / Ong, Andrew C. | NTRS | 2019



    ATD-2 Integrated Arrival/Departure/Surface (IADS) System Specification - Core STBO Capabilities

    Tyler T Ngo / Sarah Ann Youlton / Jaelin N McCreary et al. | NTRS | 2020