This document contains the system specifications and requirements verification matrix for the core STBO capabilities developed during ATD-2 Phase 2 and Phase 3.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    ATD-2 Integrated Arrival/Departure/Surface (IADS) System Specification - Core STBO Capabilities


    Contributors:

    Publication date :

    2020-07-17


    Type of media :

    Miscellaneous


    Type of material :

    No indication


    Language :

    English




    ATD-2 Integrated Arrival/Departure/Surface (IADS) System Specification - Phase 2

    Ngo, Tyler T. / Wilson, Stuart / Ong, Andrew C. | NTRS | 2019


    ATD-2 Integrated Arrival/Departure/Surface (IADS) Systems Specification - Metroplex & TOS Concepts

    Tyler T. Ngo / Sarah A. Youlton / Jaelin N. McCreary et al. | NTRS | 2020


    ATD-2 Integrated Arrival, Departure, and Surface (IADS) Operations

    Foyle, David C. / Hooey, Becky L. / Bakowski, Deborah L. | NTRS | 2018


    Distributed Schemes for Integrated Arrival Departure Surface (IADS) Scheduling

    Idris, Husni / Shen, Ni / Bertino, Jason et al. | NTRS | 2016


    ATD-2 Integrated Arrival/Departure/Surface (IADS) Phase 3 System Requirements

    Tyler T Ngo / Stuart Wilson / Andrew T Ging et al. | NTRS | 2020