The software and hardware implementation for the Penn State University network were discussed. Delayed delivery of radio frequency equipment and signal processing components resulted in modification of the original timetables. It was determined that the best approach for implementing the second very high frequency (VHF) would be when the VHF radar was in reliable and unattended operation. A short summary of the specifications for the three radars is presented.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    The Penn State Doppler network progress report


    Contributors:


    Publication date :

    1986-06-01


    Type of media :

    Conference paper


    Type of material :

    No indication


    Language :

    English




    Penn State FutureTruck 2000 design report

    Anstrom,J. / Piccard,D. / Thomas,B. et al. | Automotive engineering | 2001


    Penn State FutureTruck 2000 Design Report

    Anstrom, J. / Piccard, D. / Thomas, B. et al. | British Library Conference Proceedings | 2001


    ADVERTISERS - Penn State

    Online Contents | 2002


    Status Report on the Penn State RBCC Test Program

    Cramer, J. / Lehman, M. / Pal, S. et al. | NTRS | 2000


    Status Report on the Penn State RBCC Test Program

    J. Cramer / M. Lehman / S. Pal et al. | NTIS | 2000