The software and hardware implementation for the Penn State University network were discussed. Delayed delivery of radio frequency equipment and signal processing components resulted in modification of the original timetables. It was determined that the best approach for implementing the second very high frequency (VHF) would be when the VHF radar was in reliable and unattended operation. A short summary of the specifications for the three radars is presented.
The Penn State Doppler network progress report
01.06.1986
Aufsatz (Konferenz)
Keine Angabe
Englisch
Penn State FutureTruck 2000 design report
Kraftfahrwesen | 2001
|Penn State FutureTruck 2000 Design Report
British Library Conference Proceedings | 2001
|Online Contents | 2002
Status Report on the Penn State RBCC Test Program
NTRS | 2000
|Status Report on the Penn State RBCC Test Program
NTIS | 2000
|