The principal items contained in this study are as follows: (1) Purpose and background; (2) need for Breakwater Protection; (3) Ramp Utilization; (4) Lake Bottom Contours in the Vicinity of Breakwater; (5) Primary Protection Analysis; (6) Preliminary Cost Estimate; (7) Financing; and (8) Plan of Action.
Church Street Boat Ramp Study for the City of Evanston, Illinois
1978
38 pages
Report
No indication
English