The principal items contained in this study are as follows: (1) Purpose and background; (2) need for Breakwater Protection; (3) Ramp Utilization; (4) Lake Bottom Contours in the Vicinity of Breakwater; (5) Primary Protection Analysis; (6) Preliminary Cost Estimate; (7) Financing; and (8) Plan of Action.
Church Street Boat Ramp Study for the City of Evanston, Illinois
1978
38 pages
Report
Keine Angabe
Englisch
Bureau of accident prevention of Evanston, Illinois
Engineering Index Backfile | 1931
|