A plan of improvement is recommended to reduce the size of storm waves entering the harbor by a 70-foot extension to the south breakwater and a 327-foot arm added to the north breakwater. The harbor improvement will benefit locally-based and transient recreational craft by providing increased protection from damaging storm waves to the inner harbor. The proposed action will cause a temporary increase in turbidity, noise, and vessel traffic during construction. Fish in the vicinity of the construction will be temporarily displaced. Lake bottom area will be lost as the extensions are built.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Breakwater Extensions at Port Sanilac Harbor, Michigan


    Publication date :

    1972


    Size :

    37 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English