The navigation protection project consists of a single offshore breakwater 1,600 feet long with a top elevation of 10 feet above mean low water. The breakwater would afford storm protection, additional available anchorage space and possible change in the present circulation pattern of the harbor. A small area of shellfish habitat will be covered by the breakwater. A change in the circulation pattern may adversely effect recreational and boating resources, water quality goals and aesthetics. (Author)
Bristol Harbor Breakwater, Bristol Harbor, Rhode Island
1971
33 pages
Report
No indication
English
Noyo Harbor, California, Breakwater Stability and Transmission Tests
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1995
|King Harbor, Redondo Beach, California, Breakwater Stability Study
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1990
|