A statistical model for predicting, by shop and skill level, man-hour demands for unscheduled maintenance on aircraft. The manpower prediction technique and manpower allocation model are described. The prediction technique estimates future manpower requirements by integrating statistical estimates of aircraft repair characteristics and projected aircraft flying programs. The allocation model takes a systems approach to manpower distribution, using the predicted demands along with manpower cost and effectiveness data to match a base's shop manning with its projected flying program.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Manpower Requirements Prediction and Allocation for Unscheduled Maintenance on Aircraft


    Contributors:

    Publication date :

    1967


    Size :

    64 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English





    Predicting the unscheduled workload for an aircraft maintenance work package

    Georgiev, Krasin / Vachev, Nikolay | American Institute of Physics | 2022


    Estimation of uncertain unscheduled activities in aircraft maintenance using ER Rule

    Rosales, Leandro Julian Salazar / Chen, Yu-Wang / Yang, Jian-Bo | IEEE | 2015


    Does Periodic Maintenance Cause Unscheduled Outages?

    Berkeley, Emily / Rakas, Jasenka / Handal, Jady | Transportation Research Record | 2006


    The Redundancy of Scheduled and Unscheduled Maintenance

    I. K. Cohen / T. S. Donaldson / T. M. Rodriguez | NTIS | 1979