The study is on Service Strength Investigations for Cable-Stayed Bridges. The object of the investigations and of the measurements carried out is the establishment of a procedure to calculate the service strength of fully-locked coil cables of the cable-stayed highway bridge under real traffic conditions, taking the Rhine bridge Neuwied - Weissenthurm as an example (6-lane cable-anchored bridge with central cable plane and with individual cables of 102-118 mm. dia.).


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Forschung Strassenbau und Strassenverkehrstechnik, Heft 367, 1982 (Research on Road Construction and Road Traffic Techniques, Vol. 367, 1982)


    Publication date :

    1982


    Size :

    96 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English