Cost estimates and funding schedules are presented for a given configuration and costing ground rules. Cost methodology is described and the cost evolution from a baseline configuration to a selected configuration is given, emphasizing cases in which cost was a design driver. Programmatic cost avoidance techniques are discussed. (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Modular Space Station Phase B Extension Program Cost and Schedules. Volume 1 Cost and Schedule Estimating Process and Results


    Contributors:

    Publication date :

    1972


    Size :

    262 pages


    Type of media :

    Report