Cost estimates and funding schedules are presented for a given configuration and costing ground rules. Cost methodology is described and the cost evolution from a baseline configuration to a selected configuration is given, emphasizing cases in which cost was a design driver. Programmatic cost avoidance techniques are discussed. (Author)
Modular Space Station Phase B Extension Program Cost and Schedules. Volume 1 Cost and Schedule Estimating Process and Results
1972
262 pages
Report
Keine Angabe
Englisch