The report was prepared for the Government of Kenya and the Kenya Ports Authority. The study is the second of a two-phased effort to determine the technical & economic feasibility of the expansion of the port of Mombasa at Dongo Kundu on the South Mainland. The Phase II report: updates the trade forecast which incorporates the trends in the last four years and reflects the current economic outlook; upgrades construction cost estimates benefited by a soils boring program which defined the foundation conditions at the berth, upland & trestle crossing sites; develops a more detailed analysis of the proposed port facilities requirements & their capital, operating & maintenance costs over a twenty-year period.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Mombasa Port Expansion Feasibility Study, Phase 2. Final Report


    Publication date :

    1989


    Size :

    440 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English





    Port of Mombasa

    Urquhart, W. | Engineering Index Backfile | 1951


    Port of mombasa

    Bulkeley, G.V.O. | Engineering Index Backfile | 1932


    Port of Mombasa, Kenya

    Engineering Index Backfile | 1946


    The Port of Mombasa, Kenya

    Bulkeley, G. | Engineering Index Backfile | 1928