The study of the expansion of the port of Mombasa required a two phased effort. This is Volume 2 of Phase 1. The initial effort Phase 1, is a technical and economic feasibility study to determine the need and timing of any required port improvements. Phase 1 also considered related development opportunities such as an industrial zone including a free trade zone. The Phase 1 report summarizes all work performed and presents the conclusions and recommendations of the Consultant's study with respect to the study of the expansion of Mombasa Port. The basis of the study is an updated traffic forecast, based on the 1980 forecasts prepared for the Kenyan Ports Authority (KPA). In addition separate forecasts are provided to project that traffic which would be generated by industrial development in the Dongo Kandu area. This forecasts together with an evaluation of existing and/or improved port assets and operations were used as a basis for determining the need and timing for additional port facilities, through the year 2010.
Mombasa Port Expansion Feasibility Study, Phase 1
1984
551 pages
Report
No indication
English
Engineering Index Backfile | 1951
|Engineering Index Backfile | 1932
|Engineering Index Backfile | 1946
Engineering Index Backfile | 1928
|