This memorandum presents information describing the effects of the project on the Seaboard Coast Line Railroad Facilities and a proposed relocation plan, including costs, justification and design criteria, which would provide appropriate and reasonable compensation to the railroad. This report is submitted for approval of the relocation plan to serve as a basis for subsequent contract negotiations, detailed plans and specifications, and ultimate construction. A detailed study was made and a solution is proposed for the problem created where the proposed tailrace canal sever the Seaboard Coast Line Railroad track at Mile Post A-347.96 (centerline canal approximately 211.2 feet north of MP A-348).


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Cooper River Rediversion Project. Lake Moultrie and Santee River, South Carolina. Relocation of Seaboard Coast Line Railroad Bridge


    Publication date :

    1976


    Size :

    154 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English