Description of $40,000,000 multi-purpose development for hydroelectric power, flood control, land reclamation and waterway connecting Georgetown and Charleston; features of dams and dikes for two reservoirs, 180,000-kva power plant, etc; timber salvage; population resettlement; malaria control.
Santee-Cooper project, South Carolina
Civ Eng (NY)
Civil Engineering (New York) ; 9 , n 7
1939
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Developing santee and cooper rivers
Engineering Index Backfile | 1940
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1993
|Effects of a Proposed Bushy Park Entrance Canal Relocation, Cooper River, South Carolina
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1992
|