Description of $40,000,000 multi-purpose development for hydroelectric power, flood control, land reclamation and waterway connecting Georgetown and Charleston; features of dams and dikes for two reservoirs, 180,000-kva power plant, etc; timber salvage; population resettlement; malaria control.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Santee-Cooper project, South Carolina


    Additional title:

    Civ Eng (NY)


    Contributors:

    Published in:

    Publication date :

    1939


    Size :

    4 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Developing santee and cooper rivers

    Engineering Index Backfile | 1940




    St. Stephen Powerhouse Fish Lift, Cooper River Rediversion Project, South Carolina: Hydraulic Model Investigation

    Murphy, Thomas E. Jr. / Hite, John E. Jr. / United States. Army. Corps of Engineers. Charleston District. | HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1993

    Free access

    Effects of a Proposed Bushy Park Entrance Canal Relocation, Cooper River, South Carolina

    Teeter, Allen M. / United States. Army. Corps of Engineers. Charleston District. | HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1992

    Free access