A cost estimate of the space tug storable engine study is presented. The estimates are based on a continuing definition of engine types, production schedules, and operation rates to establish more accurate results. The costs are presented in three categories: (1) nonrecurring developmental costs, (2) production costs, and (3) operation costs. (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Space Tug Storable Engine Study. Volume 5: Program Study Cost Estimates


    Contributors:

    Publication date :

    1974


    Size :

    164 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English