A cost estimate of the space tug storable engine study is presented. The estimates are based on a continuing definition of engine types, production schedules, and operation rates to establish more accurate results. The costs are presented in three categories: (1) nonrecurring developmental costs, (2) production costs, and (3) operation costs. (Author)
Space Tug Storable Engine Study. Volume 5: Program Study Cost Estimates
1974
164 pages
Report
Keine Angabe
Englisch