Complete the development and bench testing of a full size engineering prototype for the system and initiate the in-vehicle testing of the unit. Three of the four modules, that make-up the engineering prototype, were completed prior to the start of this DOE program. The fourth module required repackaging, because of inadequate insulation and this was accomplished. 2 figs.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Fuel Savings in the Heavy Trucking Industry Through Cool Storage: Technical Progress Report, June 20-September 19, 1989


    Publication date :

    1989


    Size :

    4 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English