Complete the development and bench testing of a full size engineering prototype for the system and initiate the in-vehicle testing of the unit. Three of the four modules, that make-up the engineering prototype, were completed prior to the start of this DOE program. The fourth module required repackaging, because of inadequate insulation and this was accomplished. 2 figs.