The Corps of Engineers has proposed plans for widening six channel bends in the St. Marys River. The project is designed to provide safer navigation for the larger vessels that will be using the St. Marys River Waterway. Dredging and disposal operations would cause temporary water quality degradation. The disposal island would cover approximately six acres of river bottom and disrupt the aquatic life therein. (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Great Lakes Connecting Channels, Widening and Deepening Bends in St. Marys River, Michigan


    Publication date :

    1972


    Size :

    114 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English