The Heavy Lift Replacement (CH-53K) program mission is to generate and support a robust United States Marine Corps heavy-lift capability. The primary mission, is vertical heavy lift. The program includes improvements in lift and range capabilities, commonality, reliability, maintainability, interoperability, ship integration, survivability, and force protection. The CH-53K helicopter will be a replacement for the CH-53E.
CH-53K Heavy Lift Replacement Helicopter (CH-53K)
2013
35 pages
Report
No indication
English
Aircraft , Logistics, Military Facilities, & Supplies , HELICOPTERS , MILITARY PROCUREMENT , CONTRACTS , COSTS , FOREIGN MILITARY SALES , INTEGRATION , LIFT , MILITARY BUDGETS , PERFORMANCE(ENGINEERING) , PRODUCTION , REPLACEMENT , SCHEDULING , CH-53K HELICOPTERS , THRESHOLD BREACHES , NUCLEAR COSTS , COST VARIANCE , HEAVY LIFT REPLACEMENT
Heavy Lift Helicopter Main Engines
SAE Technical Papers | 1973
|Heavy-Lift Helicopter Power Systems
SAE Technical Papers | 1974
|The Role of the Heavy Lift Helicopter
SAE Technical Papers | 1972
|Multi-Helicopter Heavy Lift System Feasibility Study
NTIS | 1972
|Design of the Atlas Maritime Heavy Lift Helicopter
British Library Conference Proceedings | 2006
|