The Heavy Lift Replacement (CH-53K) program mission is to generate and support a robust United States Marine Corps heavy-lift capability. The primary mission, is vertical heavy lift. The program includes improvements in lift and range capabilities, commonality, reliability, maintainability, interoperability, ship integration, survivability, and force protection. The CH-53K helicopter will be a replacement for the CH-53E.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    CH-53K Heavy Lift Replacement Helicopter (CH-53K)


    Beteiligte:
    R. Pridgen (Autor:in)

    Erscheinungsdatum :

    2013


    Format / Umfang :

    35 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Heavy Lift Helicopter Main Engines

    Woodley, David R. / Castle, William S. | SAE Technical Papers | 1973


    Heavy-Lift Helicopter Power Systems

    Stein, Dennis | SAE Technical Papers | 1974



    Multi-Helicopter Heavy Lift System Feasibility Study

    K. Korsak / K. R. Meenen / D. N. Meyers et al. | NTIS | 1972


    The Role of the Heavy Lift Helicopter

    Gustafson, E. E. | SAE Technical Papers | 1972