As part of COMNAVFACENGCOM's Fleet Mooring Maintenance (FMM) Program, CHESNAVFACENGCOM has been assigned the responsibility to conduct the underwater inspections of fleet moorings worldwide. This plan provides guidelines for the underwater inspection of the fleet mooring operated and maintained by the Naval Air Station (NAS), Sigonella, Sicily. This inspection is scheduled to take place in September 1983. CHESNAVFACENGCOM has designated an Engineer-in-Charge (EIC) to provide on-site technical guidance to Underwater Construction Team One (UCT ONE) who will perform the underwater portion of the inspection. In addition, the EIC will prepare the post inspection report which will include the results of the inspection and recommendations for required maintenance actions.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Naval Air Station Sigonella (Augusta Bay) Fleet Mooring Underwater Inspection Plan


    Publication date :

    1983


    Size :

    27 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English