As part of COMNAVFACENGCOM's Fleet Mooring Maintenance (FMM) Program, CHESNAVFACENGCOM has been assigned the responsibility to conduct the underwater inspections of fleet moorings worldwide. This plan provides guidelines for the underwater inspection of the fleet mooring operated and maintained by the Naval Air Station (NAS), Sigonella, Sicily. This inspection is scheduled to take place in September 1983. CHESNAVFACENGCOM has designated an Engineer-in-Charge (EIC) to provide on-site technical guidance to Underwater Construction Team One (UCT ONE) who will perform the underwater portion of the inspection. In addition, the EIC will prepare the post inspection report which will include the results of the inspection and recommendations for required maintenance actions.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Naval Air Station Sigonella (Augusta Bay) Fleet Mooring Underwater Inspection Plan


    Erscheinungsdatum :

    1983


    Format / Umfang :

    27 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch