Operational procedures for observatory personnel involved in removing, handling, or installing the mirror of the United Kingdom infrared telescope are outlined. The ordering, location, etc. of chemicals, cleaning materials, safety clothing, equipment, etc. within the observatory are covered. Preparation of the telescope, pickup truck, etc., are detailed. The importance of transporting mirror trolley, mirror boxes, gases, etc., to desired location in advance of their being required is stressed. Six to eight people are required to carry out the operations.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    The Removal, Mechanical Handling and Installation Procedures for Re-Aluminising the Ukirt 3.8M Primary Mirror


    Contributors:
    A. A. Neild (author)

    Publication date :

    1980


    Size :

    36 pages



    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English




    UKIRT/Michelle: Mid-IR esCHELLE

    Lederer, Susan M. / Kerr, Tom | NTRS | 2018


    Recent infrared observations of comets with UKIRT and IRAS

    Zarnecki, J.C. / McDonnell, J.A.M. / Carey, W.C. et al. | Elsevier | 1984


    NASA's Newest Orbital Debris Ground-based Telescope Assets: MCAT and UKIRT

    Lederer, Susan | British Library Conference Proceedings | 2014


    Installation method of vehicle rearview mirror auxiliary mirror

    ZHANG XIAOWEI | European Patent Office | 2021

    Free access