Operational procedures for observatory personnel involved in removing, handling, or installing the mirror of the United Kingdom infrared telescope are outlined. The ordering, location, etc. of chemicals, cleaning materials, safety clothing, equipment, etc. within the observatory are covered. Preparation of the telescope, pickup truck, etc., are detailed. The importance of transporting mirror trolley, mirror boxes, gases, etc., to desired location in advance of their being required is stressed. Six to eight people are required to carry out the operations.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    The Removal, Mechanical Handling and Installation Procedures for Re-Aluminising the Ukirt 3.8M Primary Mirror


    Beteiligte:
    A. A. Neild (Autor:in)

    Erscheinungsdatum :

    1980


    Format / Umfang :

    36 pages



    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    UKIRT/Michelle: Mid-IR esCHELLE

    Lederer, Susan M. / Kerr, Tom | NTRS | 2018


    Recent infrared observations of comets with UKIRT and IRAS

    Zarnecki, J.C. / McDonnell, J.A.M. / Carey, W.C. et al. | Elsevier | 1984


    NASA's Newest Orbital Debris Ground-based Telescope Assets: MCAT and UKIRT

    Lederer, Susan | British Library Conference Proceedings | 2014


    Installation method of vehicle rearview mirror auxiliary mirror

    ZHANG XIAOWEI | Europäisches Patentamt | 2021

    Freier Zugriff