Operational procedures for observatory personnel involved in removing, handling, or installing the mirror of the United Kingdom infrared telescope are outlined. The ordering, location, etc. of chemicals, cleaning materials, safety clothing, equipment, etc. within the observatory are covered. Preparation of the telescope, pickup truck, etc., are detailed. The importance of transporting mirror trolley, mirror boxes, gases, etc., to desired location in advance of their being required is stressed. Six to eight people are required to carry out the operations.
The Removal, Mechanical Handling and Installation Procedures for Re-Aluminising the Ukirt 3.8M Primary Mirror
1980
36 pages
Report
Keine Angabe
Englisch
UKIRT/Michelle: Mid-IR esCHELLE
NTRS | 2018
|Recent infrared observations of comets with UKIRT and IRAS
Elsevier | 1984
|NASA's Newest Orbital Debris Ground-based Telescope Assets: MCAT and UKIRT
British Library Conference Proceedings | 2014
|Installation method of vehicle rearview mirror auxiliary mirror
Europäisches Patentamt | 2021
|Nut - Self-Locking Clinch, Serrated Shank, Hole Preparation, Installation and Removal Procedures
SAE Technical Papers | 2019