The purpose is to document the testing performed on both hardware and software developed under the Space Station Berthing Mechanisms Program. Testing of the mechanism occurred at three locations. Several system components, e.g., actuators and computer systems, were functionally tested before assembly. A series of post assembly tests were performed. The post assembly tests, as well as the dynamic testing of the mechanism, are presented.
Berthing Mechanism Final Test Report and Program Assessment
1988
90 pages
Report
No indication
English
TIBKAT | 2022
|BERTHING ASSISTANCE APPARATUS, BERTHING ASSISTANCE METHOD, AND PROGRAM
European Patent Office | 2023
|Engineering Index Backfile | 1964
|