An approach for operation of frontage road intersections along a major freeway is presented. The strategy considers isolated control, system control, and interface with freeway operation. Initiation of frontage road control is the second major phase in overall corridor control. The first phase, now in operation, is freeway ramp control.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Frontage Control Strategy for the North Central Expressway, Dallas Freeway Corridor Study


    Contributors:

    Publication date :

    1974


    Size :

    44 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English