An approach for operation of frontage road intersections along a major freeway is presented. The strategy considers isolated control, system control, and interface with freeway operation. Initiation of frontage road control is the second major phase in overall corridor control. The first phase, now in operation, is freeway ramp control.
Frontage Control Strategy for the North Central Expressway, Dallas Freeway Corridor Study
1974
44 pages
Report
Keine Angabe
Englisch
Dallas Corridor Frontage Road Evaluation Plan
NTIS | 1973
|North Central Expressway, Dallas: Case Study of Enhancement- Inclusive Urban Freeway Design
Online Contents | 1993
|Freeway Operations Manual, Dallas Corridor Study
NTIS | 1974
|Freeway Frontage Road Operations and Safety Study
NTIS | 1984
|